Grant

Smoke validation process for wind turbines

Patent Number ES-2962895-T3

Publication Year 2024

Granted Year: 2024

Application Year 2018

Priority Year 2017

Jurisdiction ES

Status Active

Inventors

BELLI CLAUS

Applicants

  1. Vestas (Denmark)
  2. [NORA names: Vestas; Private Research; Denmark; Europe, EU; Nordic; OECD]

Abstract

The present disclosure is generally related to validation processes in wind turbines, as well as controllers and wind turbines that implement the same. In one aspect, a method for validating smoke detection in a smoke detection system includes receiving a smoke detection indication, determining a first temperature of a temperature sensor, and beginning a heat validation operation. The heat validation operation includes starting a timer after determining the first temperature and determining whether a current temperature of the temperature sensor has increased by a predefined amount with respect to the first temperature. If the current temperature of the temperature sensor has increased a predefined amount with respect to the first temperature, perform at least one trip of a switch and activate an alarm. (Automatic translation with Google Translate, without legal value)

Patent Family Records (9)

Smoke validation process for wind turbines

Vestas (Denmark), Vestas Wind Systems AS BELLI CLAUS

2024, ES-2962895-T3

SMOKE VALIDATION PROCESS FOR WIND TURBINES  

Vestas (Denmark), Vestas Wind Systems AS BELLI CLAUS

2023, EP-3646301-C0

SMOKE VALIDATION PROCESS FOR WIND TURBINES  

Vestas (Denmark), Vestas Wind Systems AS BELLI CLAUS

2023, EP-3646301-B1

Method of verifying smoke detection in a smoke detection system of a wind turbine, controller and wind turbine  

Vestas (Denmark), Vestas Wind Systems AS C. Bailey

2022, CN-110785793-B

Smoke validation process for wind turbines  

Vestas (Denmark), Vestas Wind Systems AS BELLI CLAUS

2021, US-11210931-B2

SMOKE VALIDATION PROCESS FOR WIND TURBINES  

Vestas (Denmark), Vestas Wind Systems AS BELLI CLAUS

2020, US-20200143666-A1

SMOKE VALIDATION PROCESS FOR WIND TURBINES  

Vestas (Denmark), Vestas Wind Systems AS BELLI CLAUS

2020, EP-3646301-A1

Smoke verification process for wind turbines  

Vestas (Denmark), Vestas Wind Systems AS BELLI CLAUS

2020, CN-110785793-A

SMOKE VALIDATION PROCESS FOR WIND TURBINES  

VESTAS WIND SYS AS, Vestas (Denmark) BELLI CLAUS

2019, WO-2019001666-A1

Data Provider: Digital Science